Mathematics, 05.05.2020 20:36, whitwelllife
A company manufactures x units of Product A and y units of Product B, on two machines, I and II. It has been determined that the company will realize a profit of $7/unit of Product A and a profit of $4/unit of Product B. To manufacture a unit of Product A requires 6 min on Machine I and 5 min on Machine II. To manufacture a unit of Product B requires 9 min on Machine I and 4 min on Machine II. There are 5 hr of machine time available on Machine I and 3 hr of machine time available on Machine II in each work shift. How many units of each product should be produced in each shift to maximize the company's profit
Answers: 2
Mathematics, 21.06.2019 18:30, nickname0097
Barbara deposited $300 in the bank. if the bank pays her simple interest at the rate of 4 percent per year, how much money will she have in her account at the end of 9 months?
Answers: 1
Mathematics, 21.06.2019 22:00, dest8860
Which sum or difference identity would you use to verify that cos (180° - q) = -cos q? a.) sin (a -b) = sin a cos b – cos a sin b b.) cos (a -b) = cos a cos b – sin a sin b c.) cos (a -b) = cos a cosb + sin a sin b d.) sin (a + b) = sin a cos b + cos a sin b
Answers: 1
Mathematics, 22.06.2019 01:20, thomaskilajuwon
Me i'm timed ! a. -2 to 1 b. -1.5 to 0.5c. 0 to 1d. 0.5 to 1.5
Answers: 2
A company manufactures x units of Product A and y units of Product B, on two machines, I and II. It...
Mathematics, 02.07.2019 09:10
Mathematics, 02.07.2019 09:10
English, 02.07.2019 09:10
History, 02.07.2019 09:10