Physics
Physics, 17.06.2020 17:57, Aggie9595

Plane a travels at 900km/h and plane b travels at 250/5.which plane travels faster

answer
Answers: 1

Other questions on the subject: Physics

image
Physics, 21.06.2019 20:20, vero5047
Astronomers discover an exoplanet (a planet of a star other than the sun) that has an orbital period of 3.87 earth years in its circular orbit around its sun, which is a star with a measured mass of 3.59 x 1030 kg. find the radius of the exoplanet's orbit.
Answers: 3
image
Physics, 22.06.2019 03:30, ashah1260
Starting with only the balmer series light (visible light), how could we ensure that the solar panels generate a current that mark can use for his power station? a)by gradually increasing the brightness (amount) of light that we shine on it. b)by gradually increasing the frequency of the light we shine on it. c)by gradually increasing the wavelength of the light that we shine on it.
Answers: 3
image
Physics, 22.06.2019 12:10, malikbryant2002
Consider a one meter long horizontal pipe with a constant 100 cm^2 cross sectional area. water flows rightward into the pipe at x = 0 with flow velocity 02m/sec at every point within the pipe intake area. at x=1, the rightward flow rate is 0.192 m/sec. assume the water is a conserved quantity in the pipe, so there must be a leak (a sink) somewhere in the pipe. 1. compute net volumetric flow of the source if the system to be in equilibrium. 2. now assume the pipe in the problem has no leaks. compute the net volumetric rate of change for the system.
Answers: 3
image
Physics, 22.06.2019 13:10, jaeana
1. the materials manager for a billiard ball maker must periodically place orders for resin, one of the raw materials used in producing billiard balls. she knows that manufacturing uses resin at a rate of 50 kilograms each day, and that it costs $.04 per day to carry a kilogram of resin in inventory. she also knows that the order costs for resin are $100 per order, and that the lead time for delivery is four (4) days.2. at what point should resin be reordered? a. 0 kilograms remainingb. 50 kilograms remainingc. 200 kilograms remainingd. 400 kilograms remaininge. 500 kilograms remaining3. if order size was 1,000 kilograms of resin, what would be the length of an order cycle? a. 0.05 daysb. 4 daysc. 16 daysd. 20 dayse. 50 days4. if the order size was 1,000 kilograms of resin, what would be the average inventory level? a. 50 kilogramsb. 200 kilogramsc. 500 kilogramsd. 800 kilogramse. 1,000 kilograms5. if the order size was 1,000 kilograms of resin, what would be the daily total inventory costs, excluding the cost of the resin? a. $5b. $10c. $20d. $25e. $40
Answers: 3
Do you know the correct answer?
Plane a travels at 900km/h and plane b travels at 250/5.which plane travels faster...

Questions in other subjects:

Konu
Mathematics, 11.11.2020 05:40